Sealing the outside, working on the inside

There have been a lot of changes in the last 10 days! On the outside, the north wall is all framed in, and work is happening on both the roof and sides to start getting things sealed up before the rainy season is upon us. On the inside, the framing for the storage spaces to the left and right at the front of the sanctuary has been installed. The plumbers have been through as well, roughing in the riser and plumbing for both the fire suppression system and regular plumbing fixtures. Coming soon, the electrician will be doing their rough-in, and a few men from the church will be working on installing the low-voltage systems (network and audio systems).

 Exterior, showing progress on the roof and sides.

Exterior, showing progress on the roof and sides.

 North wall detail

North wall detail

 Interior of the North wall, framing for the storage spaces visible to the left and right.

Interior of the North wall, framing for the storage spaces visible to the left and right.